Main Pass Energy Hub TM
 

 
  LNG Receiving Terminal Permit Criteria
LNG vaporization
1.6 Bcf/d
45 MM m3 /d
Deliveries from cavern storage
1.5 Bcf/d
43 MM m3 /d
Peak deliverability
3.1 Bcf/d
88 MM m3 /d
LNG surface storage - expandable
 
145,000 m3
Salt cavern storage capacity 28 Bcf 790 MM m3
Nominal LNG throughput
7  mtpa
Nominal gas throughput
350 Bcf/yr 
9.9B m3 /yr